As soon as the trench is dug, include a concrete mixture to The underside of your trench (all-around 50mm) and go away to partly dry.Put the sleepers: Spot the railway sleepers within the concrete in the desired situation, ensuring They may be evenly spaced and aligned.Constructing a wall from metal RSJs and railway sleepers is fairly straightforw